The HVAC system at Caltex, Cluden was poorly installed and under-designed for the conditions, causing malfunctions and leading to a partial failure. The system failed to regulate temperature and humidity effectively, resulting in significant mould issues throughout the store and posing a serious health risk to staff and customers.